Superdry Maidstone

Following on from the previous stores completed for Superdry, this new large store to the Fremlin Walk shopping district in Maidstone was the first we’d built over 2 levels. The works included new glass and steel clad shopfront, steel columns, staircase, brickwork, screeded floor, oak cladding to walls, oak flooring, free standing shopfittings, ceilings, AC, lighting, data stockroom and decorations.

  • Sector: Retail
  • Duration: Eight-weeks
  • Value: £475,000
  • Design: SKK
  • Project Management: Supergroup

Vertu, Selfridges

Fit out of the prestigious new Vertu space within Selfridges Ground Floor at Oxford St, London. Work involved stripping out the old concession and installing the new corporate black unitry, cash desk, glazed screens, marble flooring and services.

  • Sector: Retail
  • Duration: Two weeks
  • Value: £40,000
  • Project Management: Shed Design
  • Archtiect: Shed Design