POD Food, Llyods Ave, London

Following on from the first POD outlet as London Wall, we were employed to create a restaurant nearby with a mezzanine level. As well as the structral works, the project also included new electrical and HVAC installation, bespoke joinery, eco-friendly finishes including sustainably sourced chestnut panels and organic paints.

  • Sector: Food & Drink
  • Duration: Eight weeks
  • Value: £190,000
  • Project Management RED Project Management
  • Architect: RED Project Management

POD Food, 162-163 London Wall

Fit out of the maiden POD food outlet in the UK. The works, carried out over 4 weeks, involved new AC, lighting, upgrading the main power supply, installation of new bespoke joinery counter, signage, shop front, display, flooring, office area, preparation area and hi spec kitchen facilities.

  • Sector: Food & Drink
  • Duration: Four weeks
  • Value: £100,000
  • Project Management RED Project Management
  • Architect: RED Project Management

Ralph Lauren Formal & Sportswear, Selfridges

Prestigious fit-out of both the Mens Formalwear and Sportswear concessions on the 1st floor within Selfridges, London. The two concessions were run concurrently over four-weeks working intensively with both PRL and Selfridges. The works were carried out during and outside store opening hours in order to minimise sales disruption. Custom made specialist mahogany fixtures and fixed wall cases and panelling incorporating nickeland glass as well as structural works to take the new shopfront. Services works included reconfigured AC, sprinklers and fire alarm, new lighting scheme and feature chandelier. Fitting Rooms and vestibule were also constructed. All new oak flooring throughout.

  • Sector: Retail
  • Duration: Four weeks
  • Value: £1m
  • Design: Polo Store Development

Marc Jacobs, South Audley St, London

This Marc Jacobs flagship store in Mayfair, London was both a challenging and rewarding project. The existing space was fully striped out and the basement / vaults partly waterproofed before the new shop was built over 2 floors. The works included oak and carpet flooring, ceilings, wall coverings, joinery, AC, lighting, external façade works, decorations, storage areas and waterproofing

  • Sector: Retail
  • Duration: Eight weeks
  • Value: £465,000
  • Cost Consultant: MRA
  • Project Management: MRA
  • Archtiect: Stephan Jaklitch NY

Harrods by Appointment

The new Mens By Appointment on the Lower Ground Floor at Harrods was our most challenging project to date. Following the strip out of the existing space, new Consultation Rooms, a Watch Room, Lounge & Bar Area, Reception and WCs were created using PU Lacquer & glass finishes as well as carpeting, decorations, AC, lighting and controls, sound system and specialist joinery pieces.

  • Sector: Retail
  • Duration: Five weeks
  • Value: £570,000
  • Cost Consultant: AB Associates
  • Project Management: Ainsley & Co
  • Archtiect: Found Associates
  • Services Consultants: E+M Tecnica

Michael Kors, Harrods

The Michael Kors corner at Harrods required some small works to enable them to open. We completed flooring, walls, window,services and decoration works

  • Sector: Retail
  • Duration: One week
  • Value: £20,000
  • Design: Michael Kors

Ralph Lauren Black Label, Harrods

Fit out of Polo Ralph Lauren’s flagship ladies wear collection in Harrods, London. The works involved strip out of the existing space, new feature ceiling incorporating unique lighting scheme, cream lacquer unitry, look walls, walkthroughs, cashwrap, fitting rooms, glazed shopfront, silver leaf curved entrance walls, new AC, Italian limestone flooring and carpeting. All the works were carried out day and night over 4 weeks complying with the rigorous Harrods working procedures and regulations.

  • Sector: Retail
  • Duration: Four weeks
  • Value: £650,000
  • Design: Polo Store Development

Superdry Basildon

This was the first Superdry store and was completed in 7 weeks. There was a very quick learning curve for this project understanding how Superdry wanted things like details of their steelwork fixings to how and the ligthing containment. The works within Basildons Eastgate shopping centre included new oak and sheet metal cladding, steel columns, brick slips, screeded and oak flooring, free standing shopfittings, ceilings, AC, lighting, data stockroom and decorations.

  • Sector: Retail
  • Duration: Eight Weeks
  • Value: £200k
  • Architect: Superdry
  • Cost Consultant: Superdry

Superdry Woking

Another new store for Superdry in The Peacocks shopjng centre in Woking. The works included a new shopfront, new glass and steel clad shopfront, steel columns, staircase, brickwork, screeded floor, oak cladding to walls, oak flooring, free standing shopfittings, ceilings, AC, lighting, data stockroom and decorations.

  • Sector: Retail
  • Duration: Eight-weeks
  • Value: £305,000
  • Design: SKK
  • Project Management: Supergroup