Birdies Crazy Golf Bar, Islington

We’re proud to announce that our team has completed the new Birdies Crazy Golf Bar at Angel Central Shopping Centre, Islington. This Design & Build project took 16 weeks working closely with Birdies and Shed Design. From shell and core, the completely new installation includes a new 9 hole crazy golf course, central octagonal bar with gantry, dining areas, specialist kitchen, customer toilets, cellar and back of house.

The holes were designed, tested and installed incorporating specialist lighting, durable materials, graphics and controls.

Specialist joinery to the bar, back bar, gantry, coats cupboards, reception stations. New shopfront signage, specialist flooring and graphics, bar & kitchen equipment, decorations, WC facilities and acoustic barriers. MEP services included AC, ventilation, public health, lighting, power, fire alarm, sprinklers system, data, AV & security.

The bar opened on schedule to fantastic acclaim

  • Value: £1.25m
  • Design: Contrada Group & Shed Design
  • Duration: 16 weeks

Supergroup HQ

Extensive refurbishment of several units at Supergroup’s Cheltenham headquarters. The works were carried out help facilitate the growth in retail, finance, marketing & product development departments. Strip out of existing services and finishes, new lighting power, data, AV, heating, ventilation, AC, walls, flooring, ceilings, feature joinery, cladding and decorating carried out over 5 months.

  • Value: £550,000
  • Client: Supergroup
  • Duration: 5 months
  • Architect: Supergroup

Superdry, Swindon Outlet Village

The new Superdry store within Swindon Outlet Village has now been completed by Contrada. The works involved joining two units together to create a 6000 sq ft space and included timber wall finishes, new floor finishes, works to the stock room and staff facilities, AC, electrical works, new lighting and decorations, a new cash register and free-standing fixtures plus works to the shopfront.

  • Value: £300,000
  • Design: Supergroup
  • Duration: 6 weeks
  • Project Management: Supergroup

Superdry, The Lexicon, Bracknell

Following on from the successful completion of previous Superdry projects, Contrada has completed the new Superdry store within the brand-new Lexicon Shopping Centre, in Bracknell. The works included a Crittal Glass shopfront, timber clad walls, new floor finishes throughout including screed to the sales area, blockwork to the lift shaft, new ceilings within the fit rooms, WCs, and managers office, the installation of a new staircase and handrail, AC and electrical works including new lighting, CCTV and security, steel cladding, works to the stockroom and decorations throughout. The store opened on the 7th September 2017 to coincide with the opening of the shopping centre.

  • Value: £950,000
  • Design: Supergroup
  • Duration: 9 weeks
  • Project Management: Supergroup

Superdry, York Designer Outlet

Superdry’s exciting new store has opened within York’s Designer Outlet. The fit-out was carried out over a period of six weeks and involved contemporary new lighting, timber wall finishes, steel cladding and a screed floor giving the space an urban feel true to Superdry’s unique style. With a new cash register, fixtures and fittings, and decorations throughout, Contrada handed over on time to a delighted client.

  • Value: £350,000
  • Design: SKK
  • Duration: 6 weeks
  • Project Management: Supergroup

Superdry Mock Shop, Cheltenham HQ

We have now completed the first Superdry Mock Shop at their HQ in Cheltenham. The 8,000 sq ft space is to be used to facilitate Superdry’s design development over the coming years. The works included new services, shop-fittings, feature finishes and decorations.

  • Value: Undisclosed
  • Design: Supergroup
  • Duration: 3 weeks
  • Size: 8,000 sq ft

 

Polo Ralph Lauren, Goodwood

Fit out of newly constructed Golf Shop as part of the prestigious Goodwood Estate Golf Club development. The work involved manufacture and installation of bespoke European Oak display unitry, wall panelling, fitting rooms & cashwrap and free standing fixtures. New Portuguese limestone flooring and fireplace hearth & surround were installed along with new lighting, chimney flue and finishes.

  • Sector: Retail
  • Duration: Eight week
  • Value: £1m
  • Design: Polo Store Development
  • Project Management: Contrada

Ralph Lauren Blue Label, Harrods

Contrada have successfully completed the new Ralph Lauren, Blue Label Shop in Harrods on the 5th Floor in collaboration with Ecce Projects.

The space which included new aged pine finish to the walls and ceiling, oak wall cases, sprayed lacquer walls, oak floor, pine beam ceiling & aged metal. We also installed free standing units, new fitting rooms, vestibule and new shop front. Works also included new lighting, power, data, adapted AC, sprinklers and controls, decorations & polishing.

  • Value: £400,000
  • Design: Ralph Lauren & Contrada
  • Duration: 6 weeks
  • Size: 2,100 sq ft

Superdry Bristol

This new Superdry store in the Cribbs Causeway shopping center in Bristol was the largest we’d built to date at approx 5,000 sq ft. The works included a new glass and steel clad shopfront, steel columns, staircase, brickwork, screeded floor, oak cladding to walls, oak flooring, free standing shopfittings, ceilings, AC, lighting, data stockroom and decorations.

  • Sector: Retail
  • Duration: Eight-weeks
  • Value: £450,000
  • Design: Supergroup
  • Project Management: Supergroup

Superdry Ashford

This was an outlet store for Superdry in Ashfords retail park and although we had 6 weeks, we were complete in 5.  The works included new glass and steel clad shopfront, steel columns, staircase, brickwork, screeded floor, oak cladding to walls, oak flooring, free standing shopfittings, ceilings, AC, lighting, data stockroom and decorations.

  • Sector: Retail
  • Duration: Eight-weeks
  • Value: £220,000
  • Design: SKK
  • Project Management: Supergroup